01 January 2011
Director is required to fill up form DIN-4 with in a period of 30 days of such changes and intimate the Regional Director (NR) NOIDA as well as to the company(ies) in which he is a director. The requested change is taken into the system on verification of the proof enclosed with the application for change request.