16 November 2007 Can anybody provide me Profarma of Internal Control of Power generating Company based on wastage?

19 November 2007 USUAL PARAMETERS IN INT. CONTROL OF WASTE POWER PROD. UNITS ARE AS STATED BELOW.

1.Project Emissions levels due to transportation of waste to processing plants,( fly ash to brick manufacturers
and transport of fluff)

2. average incremental distance for waste transporation (tonnes/truck)
3. what is the average CO2 emission factor for the trucks measured
4. the quantity of waste combusted in the year
5.quantity of combustion residues produced in the year (tonnes)
6.average truck capacity for combustion residues transporation (tonnes/truck)
7.average distance for combustion residues transporation (km/truck)
8. Project Emissions due to grid electricity consumption in processing plants calculated based on
electricity consumption at both processing plants (measured with the installed energy meters and
documented) and emission factor.
9.Measures to ensure the Results / uncertainty analysis
10.As per the Power Purchase Agreement (PPA), the energy exported to the Grid recorded from two independent meters viz., Main Meter and Check Meter and reading of main meter is used for
billing. In the event of main meter not in operation / fails, the reading of the check meter if used
for Billing.
11.The calibration of monitoring equipment IF maintained as per the requirement of regulatory agency like APTRANSCO.
12.Power Generation, Export & Auxiliary Consumption, fuel consumption if
recorded daily and the same is being verified by Manager (O&M) and approved by General Manager
(Operation).
13.Power Generation, Export & Fuel Consumption Month-wise data on Power Generation, export, import, fuel consumption and diesel consumption for the monitoring period:Month/ Year

14.Quantity of waste processed in theplant

Quantity of waste combusted /plastic combusted / organic and inorganic materials combusted

Composition of waste processed
Composition of waste combusted PowerGeneration (kWh)PowerExport
SUCH PARAMETERS ARE COMPARED QUARTER ON QUARTER BASIS TO CHECK CONSISTENCY AND VARIANCE ANANLYSIS MADE FOR FUTURE CONTROLS AND TO IMPROVE PRODUCTIVITY AND PROFITABILITY.
COST BENEFIT ANALYSIS IS MADE TO MEASURE CAPITAL EXP. BENEFITS.
UNIT POWER PRODUCED COST COMPARED WITH SALE RATE OF UNIT OF POWER TO ASCERTAIN BREAK EVEN POINT .
R.V.RAO




You need to be the querist or approved CAclub expert to take part in this query .
Click here to login now

Join CCI Pro
CAclubindia's WhatsApp Groups Link


Similar Resolved Queries


loading


Unanswered Queries