10 April 2010
agreed with Aditya and continuing that project is still not finished.
Querist :
Anonymous
Querist :
Anonymous
(Querist)
27 March 2011
not satisfied with aditya. builder develop property (flat/room) and sold fully/partly during the f.y. and if he sold part wise than cost to cost method not working properly.