I am Vinod Lakhayani (CRO 0 194854) student of PCC and I want to confirm about the syllabus of Cost Management of PCC. Whether the topic “Overhead Variance” is included in syllabus of standard costing.
This topic is included in study material but not included in the syllabus of PCC available Online data.
17 May 2008
My dear friend CA means Concrete & Accurate so whether overhead variance is included or not does not matter. learn Standard costing through Vedic Arithmetics you will not have to bother about volume of syllabus. keep on grabbing knowledge.