27 September 2014 I have come across instances where there is difference between actual production date and date on which production details are entered into DSA. For E.g materials are manufactured on 26 September 2014 while the same is entered into ERP and DSA on 27 or any subsequent date.

Are they liable to any penalty or Fine?

29 September 2014 Ready to pack goods will be entered in the RG-1 register.

Avatar

Querist : Anonymous

Profile Image
Querist : Anonymous (Querist)
30 September 2014 Thanks Sir.
Rule 27 states minimum penalty of 2000/- as there is a procedural lapse.

Are there any other penal consequences?