02 August 2013
As per THE BUILDING AND OTHER CONSTRUCTION WORKERS’ WELFARE CESS ACT, 1996, 1% of the cost of construction is paid to the Government since 5th day of November 1995.
My query is what about the period before 1995 ? Is any cess payable on building under construction as on that time or the building already constructed by that time ?
please provide guidance with sufficient clauses and notifications.
02 August 2013
Can someone share their views on this
Querist :
Anonymous
Querist :
Anonymous
(Querist)
06 August 2013
Dear Sir/Madam,
I would also like to know that whether it is applicable on construction of factory or not for one of the statement says that “building or other construction work” - means the construction, alteration, re pairs, maintenance or demolition - of or, in relation to, buildings, streets, roads, railways, tramways, airfields, irrigation, drainage, embankment and navigation works, flood control works (including storm water drainage works), generation, transmission a nd distribution of power, water works (including channels for distribution of water), oil and gas installations, electric lines, wireless, radio; television, telephone, telegraph and overseas communication dams, canals, reservoirs, watercourses, tunnels, b ridges, viaducts, aquaducts, pipelines, towers, cooling towers, transmission towers and such other work as may be specified in this behalf by the appropriate Government, by notification but does not include any building or other construction work to which the provisions of the Factories Act, 1948 (63 of 1948), or the Mines Act, 1952 (35 of 1952), apply
Refer the following link http://mau.nic.in/Departments/labour/BOCWActrules.pdf