ITC 04 Issue..

manju (Going to be CA soon.....)   (92 Points)

29 November 2018  
We have sent goods to job work in 5 lots and the job worker sent the goods in one lot... So in ITC 04. its asking the original Challan no against the Received lot.... How can i show these 4 lots that is sent against the one lot that is received