we purchased material ms sheet ( size 12 mm ) .material arrived at our works . but after inspection we found material is defective size is 10 mm as we need 12 mm so we reject material and w
e also keep material as our need . so in this case we need to raise e way bill with debit note
Plz reply
Is Eway bill required with debit note - material rejected
surender saini (ACCOUNTANT ASSISTANT) (30 Points)
17 May 2018