I was stuck in this question for like 10 minutes just because I couldn't believe the figures, thank god someone else also noticed there was something horribly wrong with the question! Labour variance was SO high and I rechecked 4 times to see if am doing something wrong.
I was sure about the standard costing question, but not it seems not so sure!