If sub contractor doing work at the site including materials (whether materials purchase @ 28% GST or 18% GST) but is the applicable rate of GST and ITC is claimable or not?
If sub contractor doing work at the site including materials (whether materials purchase @ 28% GST or 18% GST) but is the applicable rate of GST and ITC is claimable or not?