GST Rate and Input tax credit of All Construction
Chandrakant Parmar (34 Points)
05 September 2021Chandrakant Parmar (34 Points)
05 September 2021
CA Altamush Zafar
(GST Consultant)
(15971 Points)
Replied 05 September 2021
If it is construction of apartments then if your project has commenced after 1.04.2019 then no ITC and effective GST rate 1% or 5% as the case may be on residential apartments and 18% with ITC for commercial apartments. There are more details about commercial apartments in RREP or REP.
If your project has started before 01.04.2019 and you have chosen to claim ITC then rate is 12% otherwise if you have not chosen then by default it is as per first para.
For more details you can mail me.