IF OUR TWO UNIT WITH IN SAME STAE AND SAME GST NUMBER WE TRANSFER MATERIAL FROM ONE UNIT TO ANOTHER UNIT CAN NEED E WAY BILL AF MATERIAL OUT CHALLN VALUE ABOVE 50000/-
Whether an EWB is required to be generated for movement of goods from one
unit of the company to another unit through own vehicle located within 10 km?
Ans. Yes, EWB is required to be generated even in case of movement of goods within
10 km
As per the rules laid down with respect to Eway bill, a manufacturer (supplier) is required to generate the Eway bill for stock transfer or branch transfer if the value of such consignment exceeds INR 50,000
Leave a Reply
Your are not logged in . Please login to post replies