hi,
I was helping my client in his tally entry,and i came across a bill which made me confused on how to correctly enter it in tally.
Here below are the details. will be greatful if u help me out with it.
Quantity: 12.7904 MT
Rate: 23075.90 per MT
Total(12.7904*23075.90) : 295150
cess(1/8%) : 369
Education cess @ 2% : 7
SAH cess @ 1% :4
Total (295150+369+7+4) : 295530
C.S.T @ 1% : 2955
Total (295530+2955) : 298485
Insurance : 148
Grand Total : 298633