As16

rakhi agarwal (student) (189 Points)

25 October 2014  
As per mca clarification if any projects develop is not taken place due to reason beyond control the cost of borrowing was suspended what will happen in a case when a bridge was under development and work was not carried out due to heavy rainfall whether cost of borrowing will be suspended or not.