Scrutiny of GST Data Begins and GST Department Steps up The Heat On The Assessees

CMA Navneet Kr Jain , Last updated: 21 July 2021  
  Share


With the COVID pandemic subsiding, the activities of the GST department with regard to the scrutiny of the data filed for the year 2017-18 have increased.

The GST assessees are getting communications from the GST department along with system generated excel files showing various variances in different documents like differences in

a) GSTR1 Vs GSTR 3B
b) GSTR 3b Vs 2A
c) GSTR1/3B Vs GSTR 9

The communication reads as under

'GST scrutiny issues communicated by EIU for the period 2017-18 is forwarded herewith (find attachment) for your information.'

The best part of the communication is that neither any section is mentioned in the communication from the department nor what is required is mentioned in the communication. Really hope that the proper communications will be sent by the department in future.

As the communication has been sent by the concerned jurisdictional officers of GST, the assesses have to respond to that. Normally all the responses to notices etc. should be filed online through login however this type of communications are sent through the mail and the response will be sent through the mail only as per our understanding.

Scrutiny of GST Data begins

Caution: The assesses must analyze the data before submission to the authorities as the response may become the basis for raising demands by the department and the GST auditor/consultant must be apprised about the same. This has brought to the fore the need for the 'Internal GST Audits' to avoid any such adverse communications from the department later.

Some of the summarized reasons for the communications from GST department after analysis by Economic Intelligence units are given below

Analysis Parameters

Issues in GST Data filed by GST Assessees

PARAMETER-0069

In-eligible ITC claimed from non-genuine taxpayers (NGTPs) whose RC is cancelled ab-initio

PARAMETER-0070

Excess outward tax in GSTR 1 compared to GSTR 9/GSTR 3B

PARAMETER-0072

In-eligible ITC claimed from GSTR 3B Non-filers

PARAMETER-0073

Excess ITC claimed in GSTR 3B/9 which is not confirmed in GSTR 2A or 8A of GSTR 9

PARAMETER-0074

In-eligible ITC claimed from RC is cancelled suppliers

PARAMETER-0077

Less RCM Liability disclosed in GSTR 9/3B/4 than shown by suppliers in GSTR-1

PARAMETER-0078

ITC claims after the last date of availment of ITC as per section 16(4)- GSTR 3B

PARAMETER-0079

ITC on purchase invoices uploaded by supplier in GSTR 1 filed after last date of availment -section 16(4)

PARAMETER-0080

Interest on delayed payments made with GSTR 3B

PARAMETER-0081

Excess IGST on Imports shown in GSTR9_6E Vs. ICEGATE data

PARAMETER-0082

Excess ISD ITC availed in GSTR9_6G Vs GSTR 2A_ISD

PARAMETER-0083

Excess RCM ITC in GSTR9_6CDF than liability shown in GSTR 9 _4G

 

The assessess must put in internal teams to ensure that these type of issues do not crop up in the future as any lapses may cost the organizations a lot.

Disclaimer: The views expressed are personal and based on our understanding of the provisions/communications of GST. Readers are requested to refer to the specific GST provisions.

 

The suthor can also be reached at navneetic@yahoo.com

Join CCI Pro

Published by

CMA Navneet Kr Jain
(cost consulting)
Category GST   Report

3 Likes   20226 Views

Comments


Related Articles


Loading